{"id":3136,"date":"2026-02-04T14:20:33","date_gmt":"2026-02-04T13:20:33","guid":{"rendered":"https:\/\/www.negratin.com\/?p=3136"},"modified":"2026-02-04T15:10:05","modified_gmt":"2026-02-04T14:10:05","slug":"negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos","status":"publish","type":"post","link":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/","title":{"rendered":"Negrat\u00edn energizes and connects the \u201cVirgen del Rosario\u201d solar PV plant to the grid, reinforcing its position as a leader in complex renewable energy projects"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>The new photovoltaic plant, located in Motril (Granada), has an installed capacity of 29.99 MWp and will supply clean energy to more than 16,500 households.<\/strong><\/h2>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><br><strong>The company has completed the key commissioning phase and strengthens its position in the Spanish market, with a particular focus on Andalusia.<\/strong><\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Grupo Negrat\u00edn<\/strong>, a global company specialized in end\u2011to\u2011end energy solutions, has energized and connected to the grid the <strong>\u201cVirgen del Rosario\u201d photovoltaic plant<\/strong>, a 29.99 MWp project located in Motril (Granada). The project is now moving towards full operation after completing its commissioning phase \u2014 a technical milestone that demonstrates <strong>on\u2011schedule delivery<\/strong> and the company\u2019s strong capability to execute<strong> renewable projects in complex environments<\/strong>.<\/p>\n\n\n\n<p>Construction of the plant, initiated one year ago, required <strong>advanced planning and tailored engineering solutions<\/strong> due to the irregularity of the terrain. To address these challenges, the project incorporated 1,424 nationally manufactured monopile structures designed to support the installation of 42,720 solar modules, ensuring stability and maximum energy capture efficiency even under demanding site conditions.<\/p>\n\n\n\n<p>Energy evacuation is carried out through a 9.2\u2011kilometer transmission line that includes a 786\u2011meter underground section specially designed to protect the surrounding greenhouse areas, followed by an overhead stretch that crosses key infrastructures such as the A\u20117 Mediterranean motorway.<\/p>\n\n\n\n<p>The completion of this project strengthens <strong>Negrat\u00edn\u2019s <\/strong>positioning as a <strong>strategic partner for high\u2011value renewable EPC projects <\/strong>and reinforces its commitment to the Spanish market, particularly in <strong>Andalusia<\/strong>, where the project contributes to <strong>local economic activity<\/strong> and supports the <strong>region\u2019s industrial and energy ecosystem<\/strong>.<\/p>\n\n\n\n<p>The plant will generate clean electricity for more than 16,500 households and avoid nearly 29,000 tons of CO\u2082 emissions per year \u2014 a reduction that will contribute to improved air quality and to advancing <strong>Andalusia\u2019s decarbonization goals<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Maximizing energy performance<\/strong><\/h3>\n\n\n\n<p>\u201c<strong>Negrat\u00edn <\/strong>responds to the challenges of each site with efficient, <strong>tailored solutions supported by robust in\u2011house engineering capabilities and a customer\u2011centric operating model<\/strong>,\u201d highlights <strong>Celedonio Noguera<\/strong>, Executive Vice President of Negrat\u00edn Group.<\/p>\n\n\n\n<p><strong>David Torrego<\/strong>, Energy &amp; Installations Managing Director, adds: \u201cWe have applied knowledge gained throughout our international trajectory to adapt our <strong>energy solutions to a technically demanding site<\/strong>. This project also represents our commitment to creating a positive impact on the environment and on the local economy.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new photovoltaic plant, located in Motril (Granada), has an installed capacity of 29.99 MWp and will supply clean energy to more than 16,500 households. The company has completed the key commissioning phase and strengthens its position in the Spanish market, with a particular focus on Andalusia. Grupo Negrat\u00edn, a global company specialized in end\u2011to\u2011end [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":3154,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-3136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novedades-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d<\/title>\n<meta name=\"description\" content=\"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d\" \/>\n<meta property=\"og:description\" content=\"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/\" \/>\n<meta property=\"og:site_name\" content=\"Negratin\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-04T13:20:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-04T14:10:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1-1024x665.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"665\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Beatriz Fernandez Camacho\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Beatriz Fernandez Camacho\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/\"},\"author\":{\"name\":\"Beatriz Fernandez Camacho\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#\\\/schema\\\/person\\\/8f197ab1acc098a164dd0b43ae4ef955\"},\"headline\":\"Negrat\u00edn energizes and connects the \u201cVirgen del Rosario\u201d solar PV plant to the grid, reinforcing its position as a leader in complex renewable energy projects\",\"datePublished\":\"2026-02-04T13:20:33+00:00\",\"dateModified\":\"2026-02-04T14:10:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/\"},\"wordCount\":398,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/\",\"url\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/\",\"name\":\"Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png\",\"datePublished\":\"2026-02-04T13:20:33+00:00\",\"dateModified\":\"2026-02-04T14:10:05+00:00\",\"description\":\"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png\",\"contentUrl\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png\",\"width\":1562,\"height\":1014},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/inicio\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Negrat\u00edn energizes and connects the \u201cVirgen del Rosario\u201d solar PV plant to the grid, reinforcing its position as a leader in complex renewable energy projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/\",\"name\":\"Negratin\",\"description\":\"Energ\u00eda Renovable y Medio Ambiente\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#organization\",\"name\":\"Negratin\",\"url\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/logo-negratin.svg\",\"contentUrl\":\"https:\\\/\\\/www.negratin.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/logo-negratin.svg\",\"width\":229,\"height\":52,\"caption\":\"Negratin\"},\"image\":{\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/#\\\/schema\\\/person\\\/8f197ab1acc098a164dd0b43ae4ef955\",\"name\":\"Beatriz Fernandez Camacho\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g\",\"caption\":\"Beatriz Fernandez Camacho\"},\"url\":\"https:\\\/\\\/www.negratin.com\\\/en\\\/author\\\/bfernandez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d","description":"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/","og_locale":"en_US","og_type":"article","og_title":"Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d","og_description":"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.","og_url":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/","og_site_name":"Negratin","article_published_time":"2026-02-04T13:20:33+00:00","article_modified_time":"2026-02-04T14:10:05+00:00","og_image":[{"width":1024,"height":665,"url":"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1-1024x665.png","type":"image\/png"}],"author":"Beatriz Fernandez Camacho","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Beatriz Fernandez Camacho","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#article","isPartOf":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/"},"author":{"name":"Beatriz Fernandez Camacho","@id":"https:\/\/www.negratin.com\/en\/#\/schema\/person\/8f197ab1acc098a164dd0b43ae4ef955"},"headline":"Negrat\u00edn energizes and connects the \u201cVirgen del Rosario\u201d solar PV plant to the grid, reinforcing its position as a leader in complex renewable energy projects","datePublished":"2026-02-04T13:20:33+00:00","dateModified":"2026-02-04T14:10:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/"},"wordCount":398,"commentCount":0,"publisher":{"@id":"https:\/\/www.negratin.com\/en\/#organization"},"image":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#primaryimage"},"thumbnailUrl":"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/","url":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/","name":"Negrat\u00edn pone en marcha el proyecto \u201cVirgen del Rosario\u201d","isPartOf":{"@id":"https:\/\/www.negratin.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#primaryimage"},"image":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#primaryimage"},"thumbnailUrl":"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png","datePublished":"2026-02-04T13:20:33+00:00","dateModified":"2026-02-04T14:10:05+00:00","description":"Grupo Negrat\u00edn, compa\u00f1\u00eda global especializada en soluciones integrales para el sector energ\u00e9tico, ha energizado y conectado a red el parque fotovoltaico \u201cVirgen del Rosario\u201d, un proyecto de 29,99 MWp situado en Motril (Granada). El proyecto avanza hacia su plena operaci\u00f3n tras completar la fase de puesta en marcha, un hito t\u00e9cnico que confirma la ejecuci\u00f3n en plazo y la capacidad de la compa\u00f1\u00eda para liderar proyectos renovables en emplazamientos complejos.","breadcrumb":{"@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#primaryimage","url":"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png","contentUrl":"https:\/\/www.negratin.com\/wp-content\/uploads\/2026\/02\/Nota-prensa-Negratin-Virgen-Rosario-ESP-foto-proyecto-1.png","width":1562,"height":1014},{"@type":"BreadcrumbList","@id":"https:\/\/www.negratin.com\/en\/negratin-proyecto-virgen-del-rosario-liderazgo-en-proyectos-renovables-complejos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.negratin.com\/en\/inicio\/"},{"@type":"ListItem","position":2,"name":"Negrat\u00edn energizes and connects the \u201cVirgen del Rosario\u201d solar PV plant to the grid, reinforcing its position as a leader in complex renewable energy projects"}]},{"@type":"WebSite","@id":"https:\/\/www.negratin.com\/en\/#website","url":"https:\/\/www.negratin.com\/en\/","name":"Negratin","description":"Energ\u00eda Renovable y Medio Ambiente","publisher":{"@id":"https:\/\/www.negratin.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.negratin.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.negratin.com\/en\/#organization","name":"Negratin","url":"https:\/\/www.negratin.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.negratin.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.negratin.com\/wp-content\/uploads\/2023\/04\/logo-negratin.svg","contentUrl":"https:\/\/www.negratin.com\/wp-content\/uploads\/2023\/04\/logo-negratin.svg","width":229,"height":52,"caption":"Negratin"},"image":{"@id":"https:\/\/www.negratin.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.negratin.com\/en\/#\/schema\/person\/8f197ab1acc098a164dd0b43ae4ef955","name":"Beatriz Fernandez Camacho","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9feb2ca378d8482f6a21efeeb4acd071978fc1dc5922729a6db4e64dea3e3393?s=96&d=mm&r=g","caption":"Beatriz Fernandez Camacho"},"url":"https:\/\/www.negratin.com\/en\/author\/bfernandez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/posts\/3136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/comments?post=3136"}],"version-history":[{"count":4,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/posts\/3136\/revisions"}],"predecessor-version":[{"id":3146,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/posts\/3136\/revisions\/3146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/media\/3154"}],"wp:attachment":[{"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/media?parent=3136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/categories?post=3136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.negratin.com\/en\/wp-json\/wp\/v2\/tags?post=3136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}